MEP Infrastructure Upgrades -- G.O. Generator Plant
| GO Complex Generator Consolidation – San Francisco Engineer: Winsler & Kelly Consulting Engineers This project required the careful removal of rooftop installed back up power plants to be decommissioned. Six new 600 kW generators were consolidated into one location, tested and commissioned. Work was performed flawlessly without any interruption to the data center operations that serves a facility that occupies an entire city block. |